Waste Water Systems

| Home | Introduction | Design & Planning Services | Key Personnel | Experience | Clients |
| Contact Information | Feedback |

logo action2.gif (40210 bytes)

 

Building Structures
Transportation/Circulation
Construction Management
Drainage Systems
Environmental Studies
Government Liaison
Mapping & Surveying
Planning
Waste Water Systems
Water Systems

Completed Sanitary Sewer Projects

Terre View Sanitary Sewer Trunk Line Extension Project for the City of Pullman
Emergency Sanitary Sewer Rehab Project for the City of Pomeroy
Port Of Whitman County's Wilma Port Wastewater Treatment Plant Improvements
Sunset Mobile Home Park Wastewater Lagoon Improvement along Albion Road
Pullman's Hatley Canyon Sewer Trunk Line & Lift Station
Preliminary Wastewater System Reports for the Towns Of Albion, Oaksdale and the City of Pomeroy
City of Pullman Sewer System Master Plan Update
Palouse Producers Farm Chemicals Wastewater Ponds
Pomeroy's Sewer Trunk Line Replacement to the Wastewater Treatment Plant
Bellevue Housing Complex Utilities Extension in Pullman
Preliminary Report for Pomeroy's Sludge Disposal System
Colfax Brown's Addition Improvement Project

 

 
COMPLETED SANITARY SEWER PROJECTS

The following is a list of some similar projects which we have completed recently:

TERRE VIEW SANITARY SEWER TRUNK LINE EXTENSION PROJECT for the City of Pullman:
This project consisted of construction 6,160 feet of sewer pipes 8 to 18 inches in diameter. The pipe material for this project included no-joint polyethylene  pipe along an unstable embankment. This project also included easements across railroad property to permit boring under the tracks, placing steel casing, and inserting the sanitary sewer pipe through the casing for a total cost of $166,000. This sewer trunk line serves the Port's Industrial Park & WSU's Research Parks.

 

Sewer manhole 1.JPG (84805 bytes)
sewer manhole

EMERGENCY SANITARY SEWER REHAB PROJECT for the City of Pomeroy:
This $50,000 project was funded through the Department of Ecology's Centennial Clean Water Fund Program to correct a completely deteriorated sewer pipe.

 

PORT OF WHITMAN COUNTY'S WILMA PORT WASTEWATER TREATMENT PLANT IMPROVEMENTS:
This project included the preparation of preliminary engineering report, the addition of two floating aerators, and the construction of a pressurized drain piping system.

 

SUNSET MOBILE HOME PARK WASTEWATER LAGOON IMPROVEMENT along Albion Road:
This project included the restoration of the pond dikes, constructing a lift station and a pressurized disposal drain system.

 

PULLMAN'S HATLEY CANYON SEWER TRUNK LINE & LIFT STATION:
This project extended the sanitary sewer pipe from the Wastewater Treatment Plant to Colfax Highway.

 

PRELIMINARY WASTEWATER SYSTEM REPORTS for the towns of Albion, Oaksdale and the City of Pomeroy:
The Report outlined an inventory of existing conditions and recommendations for future detailed studies and improvements.

 

CITY OF PULLMAN SEWER SYSTEM MASTER PLAN UPDATE:
This Report outlined existing conditions, recommended improvements for the existing system, and a list of sewer collection systems for future growth in all directions.

 

PALOUSE PRODUCERS FARM CHEMICALS WASTEWATER PONDS:
This project included the design of ponds to accept wastewater from washing farm chemical tanks, placed sprinklers to increasing evaporation, and some ponds required pond liners.

 

POMEROY'S SEWER TRUNK LINE REPLACEMENT TO THE WASTEWATER TREATMENT PLANT:
This project included the construction of 1,625 feet of 8 to 12-inch diameter pipes. This project also installed backflow check valves on some of the low level houses which were experiencing sewer back-up during floods. This project was part of a large improvement project which was funded through $191,000 Community Development Block Grant Program.

 

BELLEVUE HOUSING COMPLEX UTILITIES EXTENSION in Pullman:
This project included the extension of utilities and pave driveways to the housing complex. The project included an inverted sewer siphon across the South Fork of Palouse River. This project was funded by the Community Development Block Grant Program.

 

PRELIMINARY REPORT FOR POMEROY'S SLUDGE DISPOSAL SYSTEM:
The preliminary Report and site study at the Wastewater Treatment Plant for sludge drying beds.

 

Water Valve 1.JPG (109429 bytes)
water valve

COLFAX BROWN'S ADDITION IMPROVEMENT PROJECT:
This project included the reconstruction of the roads, sidewalks, water, drainage and sewer system improvements. Manholes were added to permit maintenance of the 12-inch trunk line with check valves to protect some of the houses from sewer back-up during floods. This project also included the construction of a metering manhole to accurately measure the flow into the Wastewater Treatment Plant.

 

 

| Home | Introduction | Design & Planning Services | Key Personnel | Experience | Clients |
| Contact Information | Feedback |

The information herein contained is proprietary and is solely the property of md+a which is provided for information purposes only.
No part of this document can be reproduced by any means without the prior written consent of md+a.

Copyright © 1998 Munir Daud + Associates
Last modified: January 10, 1999
Created by: 
D.G.S. Designs